For the last 10 days or so they’ve been continuing to work on footings, including pouring the first concrete of construction. That is sorta a big deal, before it all was digging, it wasn’t permanent, now there is concrete up there, and the footings all told I think are going to take something around 30 full truckloads of concrete.
Right after the footings are done, the same company, Landmark Concrete, will be putting up poured concrete walls for us around the pool area. Then the separate ICF (insulated concrete forms) will come in and start pouring the walls for the house.