3rd Floor Wall Pour

The third floor was poured last Friday. We’ll see how soon the steel gets out here to finish it up, we had a two weekish ICF break in early march and they still cranked this out pretty quick.

Pictures below are taken right before the pour, some nice dawn shots. These are taken at a “sitting on the roof” sort of height.

The main rectangular section of the castle tops out at 3 floors. It still has a 60 inch battlement that will be built cantilevered out 18 inches from the wall, with corbels underneath (machicolations they’re called). So the walls, overall, get 60 inches higher than this, then they stop.

Except the towers of course. The larger, rear, towers get one whole additional story (12ish more feet), and then the same battlement on top, so call it 17 more feet. The front towers get another story as well and then a conical turret style roof (copper, yay!).

In all cases where we cantilever a battlement we’re framing it, and not making it out of concrete, because of weight. Cantilevering a stone clad framed wall is hard enough without adding in concrete. So the barbican crenelations you see below are the only actual concrete crenelations we’re making. The rest are all framed with stone cladding.

12874286_1103815016336852_315743219_o

12874368_1103813143003706_1890973769_o

12325526_1103812883003732_670888497_o

12874418_1103815226336831_536641923_o

12874541_1103815193003501_2096122986_o

1059934_1103815139670173_1287627746_o

12674892_1103814929670194_586578478_o

12874620_1103813076337046_560365886_o

12722277_1103813019670385_1719047393_o

12516690_1103812933003727_722774773_o

12874551_1103812916337062_1521947006_o

Comments

  1. Love these updates and thrilled things are progressing so fast!!! What are your landscaping plans….do you have ideas? Thanks for sharing!!!!

  2. Evillordsmurfy says:

    Very cool. It looks like the exterior is really moving along.

  3. Evillordsmurfy says:

    Any new pictures since March?